Construction Weekly Update - 1 March 2020

 Foundations/Groundwork.

  • Excavating pile caps ongoing.
  • Removing concrete and muck away from pile caps ongoing.
  • Integrity testing of piles ongoing and due for completion by the end of the week.
  • Installation of ground beams ongoing and due for completion by the end of the week.
  • Installation of drainage ongoing.
  • 50mm of Concrete blinding directly to soils below Cellcore continues
  • Installation of Cellcore board on going to pour 2 of 3 area
  • Rebar to pour 2 area on Ground floor slab. (This is to add further strength to concrete.)
  • Concreting ground floor slab, Pour 2 of 3 (concrete pour)
  • Installation of District heating and underground services phase 2 of 3 ongoing
  • Tower crane in use lifting materials to all areas inside site boundary.
  • Start to build columns to level 1 from Ground floor.

An example of Concrete Pouring.

An example of Cellcore installation.

An example of integrity testing of piles.

See attached drawing